Groundwork
G-001Cover sheetBuilt for working GCs

Construction software from people who close out jobs, not just pitch them.

One AI Estimate Builder that checks the bid before it prices it, takeoff assemblies that count their own parts, schedules, RFIs, change orders, job cost and billing you can run standalone or connected to QuickBooks Online or ERPNext. Field crews sign in from a phone link. Your data exports any time, in standard formats.

Scroll: one job, start to finish
Modules in the platform
251
Complete directory
Disciplines, one login
13
77 most-used modules
Features compared head to head
73
Against 5 competitors
Chapters in the recorded tour
29
21 minutes of clips
01TakeoffPDF · DWG · IFC

Measure off the plan set once.

Quantities come straight off the uploaded sheets and stay linked to the estimate lines that depend on them. Arm a condition, draw, and the Estimate prices itself; an assembly counts its own parts, such as the studs in a wall, from your measurement.

app.groundworkai.io/quantities
Groundwork quantity takeoff over a plan sheet
02EstimateCSI MasterFormat 2018

Price it the way you'd check it by hand.

The AI Estimate Builder checks the bid requirements and asks you to decide every trade before it matches a rate. Each line says where its rate came from, and a person reviews what the AI drafts before it counts.

app.groundworkai.io/estimating
Groundwork estimating workspace with line items and running total
03ScheduleCPM · DCMA-14

A critical path, not a bar chart.

Generate a first draft straight from the estimate's line items, baseline it, level resources, and run the same 14-point DCMA health check contracting officers apply.

app.groundworkai.io/schedule
Groundwork CPM Gantt schedule with critical path
04FieldRFI · Ball-in-court

Know whose desk it's on right now.

Every RFI links to the sheet and spec section it references and shows who owes the answer. Overdue alerts fire before a deadline slips, not after.

app.groundworkai.io/rfi
Groundwork RFI log with ball-in-court status
05Job costActual vs. budget by CSI code

Ties out to the GL, for real.

Cost by CSI code with EAC and CTC forecasting, on an append-only, hash-chained ledger where an edit breaks the chain visibly. Journal entries wait for a second person's approval before they reach the ledger.

app.groundworkai.io/accounting/job-cost
Groundwork job cost report showing actual vs. budget by CSI code
06BillingAIA G702 / G703

The pay app is the same numbers.

The G702/G703 generates from job cost and executed change orders, retainage per line, prior certificates carried forward instead of retyped. Approving it raises that period's invoice.

app.groundworkai.io/accounting/billing
Groundwork AIA G702/G703 pay application
A-200Contact sheet

More of the platform, in real screens.

Fifteen more modules people run every day. The complete catalog is on the modules page.

A-300Sheet index

One platform. 13 disciplines. One login.

77 most-used modules across 13 categories, out of 251+ in the full directory. Every one is included in the Groundwork plan price; nothing here is a separate line item.

Just need takeoff and estimating, not the full ERP?

Groundwork Takeoff is a standalone native app for Mac, Windows, and iPad. Its own product, its own price.

See Groundwork Takeoff
C-001How we stack up

Built for a GC who wants control of the price and the data.

Groundwork publishes its price, has no per-module upsells inside a plan, exports your data in standard formats any time, and builds certified payroll and federal compliance into the core. Compare each point against the vendors you are evaluating.

Operate the full comparison, five competitors, every feature
Groundwork
Full data export, anytime
Certified payroll built in
One login for every module in your plan
Published price that scales down
V-001Recorded walkthrough

Watch Groundwork run a real project, start to finish.

Real clicks, real typing, no slides, in 29 chapters you can jump between. It plays on the demonstration page.

Watch the tour
Chapter 01 of 29 · Introduction
The opening chapter of the recorded Groundwork walkthrough
NextLive walkthrough20 min

See it running a job that looks like yours.

No sales deck first. We load a project of your type and size and walk your team through it live, in the real product.